Depth of Well Foundations of Railway Bridge Over River Ravi at Abdul Hakim 'Source Title' Bulletin of Irrigation, Drainage and Flood Control Research Council Volume Vol.2, No.2

By Vohra, A.A.I

Bibliographic details

Summary

The old railway bridge across the river Ravi at Abdul Hakim and the old Sidhani Barrage downstream of the bridge were originally designed for a maximum discharge of 100,000 cusecs. In 1961, when it was planned to construct the Trimmu-Sidhani-Mailsi Link under the Indus Basin Settlement Plan, it was decided to design the Sidhani Barrage for a maximum discharge of 150,000 cusecs and to locate it supstream of of the bridge. Therefore, the bridge had also the be redesigned to safely pass 150,000 cusecs. In this paper, the author has presented the design procedure for the bridge involving deep well foundation to withstand the deepset scour at the maximum discharge without endangering the structure. The proposed design was tested on hydraulic models in the Irrigation Research Institute (Punjab), for maximum river bed scour with the designed discharge. Various considerations on which the design was based, reasons for the use of deep well foundations, and details of the old and the new bridge are given in the paper.