PakCat catalogue record

Proforma PC-1 Shahpur SCARP, 1974

Bibliographic details

Summary

Objectives of the project:The major objectives of the project is control of waterlogging and salinity through tubewell drainage.However,as the ground water to be pumped for drainage purposes is of useable quality, it is therefore,intended to use this additional water in meeting the irrigation water shortages, and also to increase the cropping intensity. Present cropping intensity(excluding uncommanded area in unit II)is 102.5percent.The drainable surplus to lower the water table beyond 15 feet is approximately1d,86,000 arcre foot, of which some is being pumped through private tubewells. the additional quantity of water abailable i9s expected to increase the future cropping intensity to 150 percent. it is anticipated that with the full development, the present benefits of the projectestimated at 8 million rupees would increase to 42 million rupees by 2015.(LB)