PakCat catalogue record

Review of Pipe Drainage Projects in Pakistan 'Source Title' Proceedings of National Workshop on Drainage System Performance in Indus Plain and Future Strategies January 28-29, 1995 Volume Vol.3

By Bhutta, M.N

Bibliographic details

Summary

Pipe drainage to control waterlogging and salinity was introduced in Pakistan for the last two decades. Three projects, the East Khairpur Tile Drainage Project, the Mardan SCARP Project and the Fourth Drainage Project (FDP) have been completed. The Chashma Command Area Development Project (CCADP) is almost near completion. Design and tendering for the Khushab SCARP Project has been completed. The design for the Fordwah Eastern Sadiqia South (FES) subsurface drainage field trials is completed. The determination of the drainage coefficient, the drain depth and the lateral spacing are described in the paper. The comparison between different projects indicates that the drainage coefficient for new projects is considerably lower than for the older projects. The monitoring data indicate that drain discharge was less than the design assumptions during the observation period but the design rainfall did not occur during this period. The data also show that water table is lower than the designed after the installation of the Projects.