Drought Reduction in Mole Drainage Practice 'Source Title' Journal of Engineering and Applied Sciences Volume Vol.3, No.2
Bibliographic details
Summary
A field investigation was carried out to isolate the forces acting on various components of a mole plough using extended octagonal ring transducers. The phenomenon of cutting the soil in stages in order to reduce the draught requirement of moling operating was applied by cutting a slot at different depths piror to moling operating and it was observed that a significant reduction in draught (upto 37%) was achieved when a slot was cut at 240, 340, 420 mm depth prior to moling operation. Mole plough leg contributed 74% of the total draught force. Soil disturbance increased at depth when slot was cut prior to moling operation. Total resultant force acted at 8.15, leg resultant at 4.4 and Cartridge resultant at 37.9 to the horizontal.