PakCat catalogue record

Technical Social And Economic Aspects Of Water Resources Management In Salinity Control and Reclamation Project No 1 Research Report, 1981

By Awan, N.M

Bibliographic details

Summary

This report has been presented in six chapters which vover almost all technical social and economic aspects of the project. The first chapter gives a brief account of waterlogging and salinity problem and the way the foreign experts have conceptualised solutions to the problem with the ultimate aim of rapd growth in agricultural production. Numeruous data on groundwater table, tubewell performace, surface salinity, irrigation water and agriculture, were available with the SCARP-I. Analysis of the data collected during the survey is presented in Chapter-3. Economic analyis based on the same data is given in Chapter-4. A number of technical, social, economic and manageial factors constraining agricultural growht have bee to present research and training needs to fill in the gap that now exists in knowledge of the project managers.