Hydrologic Monitoring and Tubewell Performance, Jue Sheikh Unit Peshawar Scarp 1990-91
Bibliographic details
Summary
In 1990-91, the specific capacity of 03 tubewells reduced from 26 to 50 percent which may be under taken for rehabilitation. However, 04 tubewells showing reduction more than 50 percent may be cheked for replacement. The median specific capacity of the tested tubewells (10 Nos.) has decreased from 30.6 to 19.4 1pm/dm (20.5 to13 gpm/ft) of draw down acceptance. There is 4 percent decrease in disaster area (0-150 cms) which is mainly due to decrease in canal supplies. No sand contents in effluents of the tested tubewells were found. As the actual discharge capacity of the tested tubewells is 5 percent less than the designed it is recommended that discharge of tubewells registering reduction of more than 25 percent in their specific capacities be increased by rehabilitating them. (L.B.)