Hydrologic Monitoring and Tubewell Performance, WARSAK UNIT, Peshawar SCARP 1990-91
Bibliographic details
Summary
In 1990-91, the specific capacity of 01 No. tubewell reduced upto 15 percent and 2 Nos. tubewells showed reduction between 26-50 percent which should be under taken for rehabilitation. The median specific capacity has decreased from 15.7 to 12.7 1pm/dm(10.5 to 8.5 gpm/ft) of draw down since acceptance.None of the tested tubewells was found giving sand. As the actual discharge capacity of the project tubewells is 8.5 percent more than the designed capacity, it is recommended that discharge of the tubewells registering higher values than designed capacity be controlled down to their design values with the help of sluice valves, as higher entrance velocities thus caused may end up in early choking of tubewell screens. (L.B.)