PakCat catalogue record

Review and Appraisal of Scarps (Northern Zone)

Bibliographic details

Summary

Recommendations given in the report are: ; For proper upkeep and to maximize the return from Scarps, reorganization of operating agencies on scientific lines is inevitable. The crux of the problem is the shortage of dedicated personnel who are technically sound and well trained. ; Irrigation water from canals is being supplied at watercourse head (assuming 50% losses) at the rate of Rs.9.6 per acre foot while the cost of water from new Scarp tubewells is roughly Rs.125 per acre foot. It will therefore, be seen that a wide variation in the cost of rrigation water prevails depending upon the source and this is despite the fact that the purchase price for agricultural commodities is uniform throughout. Canal water is thus supplied at a cheap rate and the water from the Scarp projects has to be subsidised reducing the financial viability of the projects. In addition, it affects the efficient operation and maintenance of both the canals and surface drainage system as well as the tubewell irrigation and drainage projects due to lack of finances. To provide equal opportunity for the development and efficient integrated use of surface and ground water resources, it is desirable that uniform water rates and drainage cess, irrespective of the source of supply or mode of drainage be charged throughout the irrigated areas. Hoever, in arrving at the revised rates, due consideration needs to be given to the variation in water input per cropped acre due to climatic differences. The water rates need to be revised every five years to make the irrigation and drainage systems financially viable. ; Currently the Scarp projects are not financially viable due to low water rates. Therefore, an orientation in future planning is required to encourage participation of private sectors through selective treatment of the problem and thus shifting part of the burden from the Government exchequer to the private sector. ; During this study it is keenly felt that the maintenance and recording of tubewell data relating to costs, construction, operation and maintenance is extremely poor. It is, therefore, considered that necessary computerized data collection forms be prepared to be filled in by the operating agencies and passed on to the centralized computer unit where the computor data files can be easily prepared and subsequetly used for quick analysis. ; Among the rehabilitation measures so far used, blasing with primacord has produced comparatively better results at low cost, though these are very short lived. Whereas, it is recommended to undertake research in tubewell design, rehabilitation and operation and maintenance procedures. The problem being mainly of cementation of the gravel pack, therefore, as an interim measure metallic screens may be preferred wherever possible.