Gaja Tile Drainage Project Planning Report
Bibliographic details
Summary
The project development plan described in this report involves construction of a network of buried plastic tile and concrete collector drains, enlargin and improving the existing open surface drainage system, and remodelling of the existing canal irrigation system to accommodate increased canal supplies. Provinsions have been made to dispose of the drainage effluent of the order of 565 cfs into the existing Kara Ghungroo open drainage system. Innitially the quality of the drainage effluent will be too saline to use for irrigation purposes but shall improve with time due to constant leaching of salts from the upper soil profile. Watercourse improvement works in about ten percent of the project area is also included in the plan for demonstration and education purposes. Project construction will require five years to complete and the capital cost required is in the order of Rs.483 million, of which Rs.24 million will be in foreing exchange. Benitis from the proejct include control of the water table, reclamation of saline lands and increasing cropping intensity in the project area from 81 percent of the CCA at present to 150 percent at ultimate development. Crop yields will also increase manifold. The project has been analysed economically and at 15% discount rate the benefit cost ratio is 1.16:1 and an internal rate of return 16.5 percent. Although the use of bureid tile for drainage has been successfully practiced in many countries including the United States, Holland, Egypt, and Iraq, the method has not been carried out on a large scale in Pakistan. It is pointed out, however, that the East Khairpur Tile Drainage Project is now under construction in Pakistan. Funded by the World Bank, this project will involve procurement of tile laying equipment and machinery, which shall profitably be used in Gaja.