"Design of Interceptor Drains in Nawabashah Sub-Project" 'Source Title' Proceedings of 5th International Drainage Workshop, February 8-15, 1992, Lahore Volume III
Bibliographic details
Summary
To intercept and recover canal seepage before it mixes with the saline groundwater, interceptors drains are proposed along the main and branch canals of the Left Bank Outfall Drain Stage 1 Project in Sindh Province, Pakistan. Some aspects of design for the Nawabshah Interceptors Drain Contract are described. Interceptor drains are single or double lengths of sub-surface drains laid parallel and adjacent to a canal. The diameter of the pipeline chosen for the interceptor drains varies from 6 to 12 inches. The total length of interceptor drains in the project will be 506,000 ft. The depth of the drain will vary from 6 to 11 ft, whereas the distance from the outer toe of the canal embankment will vary from 30 to 60 ft. Along 10 percent of the canal length two lines of interceptor drains will be provided. The interceptor drain will be provided with three types of envelope materials i.e natural gravel, geotextile fabric and a combination of dune sand ang geotextile fabric. Depending upon the site conditions, between one and four interceptor drain lengths will outfall into a single pump sump. There will be a total of 54 pump sumps intercepting over 60 cuusec of canal seepage. Manholes and crossings for watercourses, roads and canals will be provided along the interceptor drains. Based on the tender rates submitted for the Nawabshah Interceptors Drain Project, the economic cost and cost-benefit ratio of intercepted water has been calculated. The cost per acre -foot of intercepted water reduces as the drain discharge rate increases. The cost benefit ratio is very sensitive to the discharge rate and the type of envelope material used.