PakCat catalogue record

Khairpur Tubewell Drainage Project Completion Report, 1970

Bibliographic details

Summary

Khairpur Tubewll Project lying approximately 300 miles inland from Karachi, in West Pakistan, on the left bank of the River Indus, combines the functions of drainage and irrigation. It is believed to be the first tubewell project in the world to utilise glass reinforced plastic, or "fibreglass" for well casing and screen in place of the more common materials such as mild steel, stainless steel or brass. The object of the Project is essentially drainage. It is intended to lower the water table over the whole area, by pumping, to an average depth of 7 feet at all seasons, the saline groundwater being drained away into the Rohri canal where adequate dilution will occur. Where the groundwater is relatively pure it is used to augment irrigation supplies at the same time as controlling the water table.(LB)