"Notes on the Experience from Drainage IV Project, Pakistan 'Source Title' Proceedings of 5th International Drainage Workshop, February 8-15, 1992, Lahore Volume III
Bibliographic details
Summary
During the planning, design and construction of the subsurface drainage works at drainage IV Project, a variety of problems were encountered, which in some cases resulted in implementation delays and cost overruns. These problems were studied and translated into decisions for "on the job design" modifications. This learning opportunity resulted in accumulation of experience and know-how, which is intended to be shared with the participants of the workshop.