Mangtanwala - Muridke Unit Groundwater and Reclamation Program Project No.4 Upper Rechna Doab Completion Report, 1971
Bibliographic details
Summary
The Mangtanwala and Muridke Units are part of Salinity Control and Reclamation Project 4, Upper Rechna Doab. They consist of 311 and 624 tubewlls repectively, along with the electrification features and water distribution structures. The area of the two units is approximately 162,000 acres, all of which is commanded by the Upper Chenab Canal, the BRBD Link Canal, or the M-R Link Canal. Since the two units are contiguous and were consturcted by the same contractor nearly simultaneously under very similar agreement with the Authority, the two units will be considered as a whole. This report has been prepared to provide a permanent record of the vents leading to the construction of the works, a summary of the history of construction, summary of costs of the tubewells and other information which may be of interest to those seeking information on the project. Electrification of the wells, construction of operators' quarters works were not a responsibility of Tipton and Kalmabch, Inc., nor part of the prime tubewell contract. (LB)