PakCat catalogue record

The Control of Groundwater Table at Moenjo -Daro

By Aryne, S.A

Bibliographic details

Summary

The plan for groundwater control presented here is by no means the last word at the present juncture. Its refinements will be necessary when the results obtaining from a study of the aquifer and groundwater behavioir are finalised on test pumping and the design parameters are confirmed or have to be revised. In any case it is a happy augury that for the first time ever since Moenjo-Daro drew the world attention to its sad plight, a modest beginning has been made by the Government and UNESCO. One tubewell has already been drilled. Its pump and motor assembly is in the process of erection. Similar equipment for another two wells has been ordered by the UNESCO from Germany and well drilling to receive it will start immediately after the development of the test well. It is our sincere hope that this work will be permitted to continue until the desired aims and objects of the plan are achieved because there is a long way to got yet. The human angle in this scheme has not been forgotten either. The developmental aspects have been thoroughly probed and given due importance and it is estimated that the plan of groundwater control along will provide material benefits to a populance of nearly 10,000 souls. In combination with the river training works they may effect the life, land and well being of many more.