Project Report of the Groundwater and Low-Lift Pump Irrigation Project in the Project in the Northwestern Distt of Pakistan
Bibliographic details
Summary
The project as originally conceived and authorised in PC -I of April, 1960 provided for the following: a) Groundwater investigations and soil surveys in the Districts of Dinajpur and Rangpur. b) Construction of 300 electrical tubewells and 80 diesel low-lift pumps for irrigation of 100,000 acres of agricultural lands. c) Construction of central power plant and transmission lines for operation of tubewells. d) Construction of pump houses and staff quarters. After the second German loan was negotiated the original scope of work of the project was revised by a new PC-I of October, 1963, as follows: a) Size of project area was increased from 300 to 380. c) Originally proposed 80 imported diesel low-lift pumps of 4.0 cusec capacity. d) Power Plant was expanded to provide electricity for 380 tubewells and 60 electrical low-lift pumps. e) 800 diesel low0lift pumps, of 1 to 2 cusec capacity, which were received from the Agricultural Department, were added to the project.(LB)