Short Term Solution of Erosion Development at the Guide Banks of Dadu Moro Road Bridges 'Source Title' Mehran University Research Journal of Engineering and Technology Volume Vol.8, No.1
Bibliographic details
Summary
The Dadu-Moro Road Bridge is in a grave danger of virtual collapse due to erosive actions taking place at its guide banks. Already a portion of about 350 ft just below the nose of Right Guide Bank (R.G.B) has been washed away. The damages taking place due to erodibility are mainly due to silting and formation of a thick jungle on right side of the bridge. The problems was further aggravated by the change in river course taken place due to braiding and meandering tendency. Presently, mighty river indus makes a big loop of about 12 miles on the right side before coming parallel to the bridge and then flows from the side of left guide bank (L.G.B) as shown . This paper discusses about eh acute problem developed at Dadu-Moro Road Bridge. It has been studied carefully and inutely. The proposals /suggestions have been made on the basis of model study of proptype. The work has been started at prototype and the progress on suggested remedial measures is quite well and encouraging.