PakCat catalogue record

Development and Use of the Water Resources of the Indus Basin: Vol.4 Operation Studies 1968

Bibliographic details

Summary

The primary objective of the operations studies is to describe operating rules for storage and routing of surface water supplies which, with coordinated withdrawals of ground water, will insure maximum conservation and use of the water resources of the Indus Basin after completion of the Regional Plan program of works. The physical works assumed to be available for the conveyance and distribution of surface-water supplies are those which will exist after completion of the Indus Basin Project (IBP). The IBP works consist of Mangla Dam on the Jhelum River with a reservoir capacity of 5.3 million acre feet (maf) which went into operation in 1967; Tarbela Dam on the Indus River with a capacity of 11.1 maf scheduled for completion in 1975; and several link canals which will become operational between 1967 and 1972 and will provide for the transfer of about 23 maf per year of surface supplies from the western rivers to the lands of the eastern rivers. Principal features of the surface-water diversion and distribution works are described in Table N-1, and are shown on Figure N-1. From the standpoint of operations, the region may be divided into two major water supply areas, one served by Tarbela Reservoir, and the other by Mangla Reservoir and the unregulated flow of the Chenab River.