PakCat catalogue record

Feasibility Studies for Proper Management of Flood Flows of Sukkur Barriage: Monthly Progress Report Period Ending Nov 1979

Bibliographic details

Summary

The river survey upstream and downstream and downstream of Sukkur Barrage was started and the collection of data and hydrologic and hydraulic studies contined during the month. The overall progress is estmated as fifteen percent. The staff working on the project is listed in Attachment-I. A brief description on the activities and studies in connection with the project is given in II and III below