Sukh Beas Drainage Project; Appendix-H Project Concept and Sizing
Bibliographic details
Summary
This appendix discusses the broad concepts on which the project framw-work has been based and considerations involved in selecting a suitable size of the project. The project concepts include the following:- Reactivation of Old Drainage Lines. Network of Tributary and Branch Drains to remove the effect of ponding. Quickest possible disposal of storm water into the River. Treatment of Sukh Beas Nullah beyond the Sukhnai Diversion. Essentially a Surface Drainage Project to Prevent ponding. Preventing Salinisation in the Lower Reaches. Field Ditches and Laterals. Pilot Project in a Small Area. Terracing of Escarpment (Dhaya). PROJECT LIMITATIONS. PROJECT SIZING. Return Period for design of existing. Sukh Beas main and tributary drains. Design return period for inlets. Design return period for bridges, siphons and aqueducts of Sukh beas main Nullah. Design return period for bridges, siphons and aqueducts of tributary and branch drains.