PakCat catalogue record

River Training Upstream Shahdara Waste Water Treatment Project, Hydraulic Model Study

By ity has planned to install a waste water treatment plant in the said

Bibliographic details

Summary

The waste water of Lahore city is disposed off into River Ravi from the left side through a number of drains both upstream and downstream of Shahdara Bridges. The major drain joining the river upstream Shahdara bridges is named as Shad Bagh Drain. It meets the river area through Mahmood Booti Bund and then drains in the river Khadir upstream Khokhar village to meet with the winter water channel of river Ravi. The waste water of the drain pollutes the river flow and creates environmental hazards. The Lahore Development Authority has planned to install a waste water treatment plant in the said reach near village Bhamme in order to solve the pollution problem of the area. Due to scarcity of land in city area, the project area has been selected in the river flood plain just upstream of the existing sloping spur along Mahmood Booti Bund. This area has been proposed to be encircled by earthen embankments. The object of the scale model study was to evolve suitable river training and flood protection works to ensure the safety of the project area during floods.(L.B.)