PakCat catalogue record

Hydrologic Monitoring and Tubewell Performance in Sukkur Tubewell Pilot Project 1976-77

Bibliographic details

Summary

Conclusions: The salient conclusions derived from the analysis presented in the report are: ; 1. The average water level blow general land surface during October 1975, 1976 and 1977 was 6.8 feet and 6.5 and 7.0 feet resepectively. The watertable in October 1977 has gone down by about 0.2 ft and 0.5 ft as compared by watertable depth in October 1975 and 1976 respectively. ; 2. The fluctuations of water table in the project area are directly co-related with the water levels in the Indus. Average groundwter level is 6 to 8 feet below general ground level in the months of August and September and it goes down 14 to 16 feet below ground level in the month of April. ; 3. The pumping capacity of the project tubewells has increased by about 4 percent since acceptance. 11 tubewells have shown increase in their discharges while 7 tubewells show reduction. The reduced discharge of these 7 tubewells has remained more than the value of design discharge. ; 4. The median value of specific capacities of tubewells has decreased by about 4 percent since acceptance. Specific capacities of 9 tubewells i.e 50 percent of the total tubewells have reduced. ; 5. None of the project tubewells was found to have any sand blowing problem. ; 6. Wire to water efficiency of tubewells ranges between 36 and 60 percent.