PakCat catalogue record

Tubewell Performance And Hydrologic Monitoring Appraisal In Lower Hujjan Scheme In SCARP-IIA (July 1971 to June 1972)

By Ch. Muhammad Hussain

Bibliographic details

Summary

The annual pumping capacity of project wells at the time of acceptance tests was 166,900 acre ft.The discharges of project wells have decreased by 6.6% during 1971-72.Of this 4.5 and 1.4 % reduction is attributed to pump and well problems,respectively and the remaining 0.7% is due to lowering in groundwater table.The main value of specific capacity at the time of acceptance tests and during 1971-72 was 105 and 93 gpm per foot respectively,thereby showing a reduction of 11.4%