PakCat catalogue record

Project Planning Report: Supplemenet; Appendices; Appendix MS: Project Layout Studies; TM-29: Replacing Low Level Tunnels with Orifice Spillway; TM-35: Low Level Outlet Works. Flip Bucket Plung Pool Alternative; TM-36: Dam Section over the Power and Low Level Conduits; TM-38: Handling of Kharjwan Nala; TM-40: Layout of Left Bank Works; Appendix RS: Orifice Spillway; TM-33: Orifice Spillway Energy Dissipation; Appendix HHS: Power Aspects; TM-34: Gas Insulated Switchgear; TM-42: Turbine Relief Valves Volume Vol.II

Bibliographic details