Hub Dam Spillway Stilling Basin Design
Bibliographic details
Summary
As a result of series of tests, the origional profile of chute of the Hub Dam Spillway was modified to eliminate separation of flow as observed from piezometric points in the origional design. The revised design of the chute was adopted in subsequent series of tests. The present note embodies the tests conducted so far to fix the dimensions of the stilling basin from hydraulic considerations. (LB)