PakCat catalogue record

Groundwater Development Project Feasibility Studies of Loralai Sub-Basin Baluchistan: Text and Illustrations

Bibliographic details

Summary

This feasibility study of Loralai Sub-Basin establishes that about 32 cusec of useable ground water is available. Providing 50 percent of the existing potential for the first phase development, 16 cusec can actually be developed safely keeping in view the periodical draught occurrence in the region. The plan therefore envisages installation of 40 tubewells (24 of 1 cusec and 16 of 0.5 cusec capacity) to extract about 11,484 acre feet of water annually. At a suggested 50 percent operational factor this quantity is proposed to irrigate 3,310 acres of land at a cropping intensity of 115 percent and irrigation efficiency of 70 percent. The project proposal also suggests other concurrent measures such as application of fertilizer, improved seed, agriculture extension, land levelling etc. to improve agricultural production. The total cost of the project is estimated to be Rs. 41.2 million. The economic analyses carried out for the project indicates that the Benefit Cost ratio is 1:1.08 and internal rate of return (IRR) is 17 which suggests that the project is economically viable. The project is scheduled to be completed in two years time.