Results of Drilling (Coring and Non-Caring) for Survey and Investigation and Collection of Hydrogeological and other Data to Carry out Feasibility Stuides for Construction of Detersion Diversion or Interception structure Across Hill Torrents Around Karachi
Bibliographic details
Summary
Conclusions: The drilling carried out at sites Jarando at RD-28, Langaji at RD-27, 42 and 65, Wattanwari Nai at RD 31, 41 and 49, Kankar Nai at RD-8 & Thado Nai at RD-7 revealed that the thickness of overburden is within 15 feet depth from the surface which shows better locations for construction of detention diversions. However at all other drilling sites like Jarando at RD-56, 48, Wattandwari at RD-7, 17 and Sukhan Nai at RD-9, 17 and 28 the thickness of the alluvial deposits is from 30 to 60 feet or more below land surface. The fiedl permeability values determined at each site range within 10-2 cm/sec. which indicates that the overburden has a high permeability.