PakCat catalogue record

Technical, Social and Economic Aspects of Water Management in Salinity Control and Reclamation Project No.1 in Pakistan: Prepared for UN University, Tokyo

By Awan, N.M.

Bibliographic details

Summary

The report has been presented in six chapters which cover almost all technical, social and economic aspects of the project. The first chapter gives a brief account of waterlogging and salinity problem and the way the experts had conceptualised solutions to the problem with the ultimate aim of rapid growth in agricultural production. This brief review formed the basis for identifying objectives of this research study. These have also been outlined in Chapter-I. It is almost two decades since the Project has been in operation. Numerous data on groundwater table, tubewell performance, surface salinity, irrigation water and agriculture were available with the SCARP-I Directorate of the Punjab Irrigation & Power Department, Central Monitoring Organization of WAPDA and the Punjab Agriculture Department. The data were used in Chapter-2 to draw some essential conclusions regarding the performance of the Project. It is now being recognised all over the world that many of the problems affecting performance of water resources projects may be social, economic or organizational in nature. Since data on these aspects were not available with any organization, in research team conducted a survey of the project from April to July, 1980. During this survey 947 farmers on 144 watercourses were interviewed. Analysis of the data collected during the survey is presented in Chapter-3. Economic analysis based on the same data is given in Chapter-4.The data have shown that the project has not been properly managed.