Comments on P&I's Mirani Dam Project-Revised Feasibility Report August 1984
Bibliographic details
Summary
Initial feasibility study of Mirani Dam Project was prepared Planning and Investigtion (P&I) Organisation of WAPDA during 1972-74. Based on geological investigations, topographical features and sub-surface explorations an earthfill dam to store 0.5 MAF of water was suggested for providing irrigation supplies to over 32,000 acres. Upon its consideration by the Special CDWP meeting in May 1983, it was rightly recongnised that the feasibility study needed an in-depth review of the hydrological parameters forming basis of the scheme. Consequently, in August 1983 a Special Task Force (STF) headed by Chief Engineer Adviser, Ministry of Water and Power was created to do the needful. In September 1983, STF recommissioned P&I Organisation of WAPDA to prepare by August 1984 a revised project feasibility with particular reference to hydrology and hydropower generation.(LB)