Hydrologic Monitoring and Tubewell Performance, Sukh Beas Scarp Phase-1 1990-91

Bibliographic details

Summary

The actual discharge capacity of the tested tubewells is 12.0 percent more than the designed capacity. In 1990-91, the specific capacity of 18 and 19 tubewells reduced upto 15 percent and 16-25 percent respectively. Two tubewells showed reduction of 26-30 percent,whereas 8 and one tubewells showed reduction between 31-40 percent and 41-45 percent respectively. Tubewells showing reduction from 16 -45 pecent may be under taken for rehabilitation. The median specific capacity of SCARP tubewells, tested during 1990-91, decreased from 69-57 1pm/dm (46-38 gpm/ft.) of draw down, thereby showing decrease of 17 percent since acceptance test. Overall reduction would be reflected only if all the tubewells were operating. The wire to water efficiency of tubewells SB-18,31,32,45,48,49,51,52 and 82 is less than 30 percent due to frictional losses in the pumping units. None of the tested tubewells was found giving sand. The electrical power consumption rate could not be tested in 9 tubewells due to defective/missing meters. There was 2.52 percent increase in disaster area during June 1991 and 3.15 percent increase during October 1990 as compared to June 1990 and October 1989. The main cause of an increase in disaster area was due to more rainfall and less pumpage during 1990-91 as compared to 1989-90.(L.B.)