Tubewell Performance in Pilot Project Scheme Yar Hussain Sharif Area between Mardan and Swabi Irrigated by USC System for the year 1987-88
Bibliographic details
Summary
The main objectives of the report are (i) to pin-point the tubewells of the project area which show decrease in specific capacity with time and intimate the operating agency for immediate corrective measures to be taken for their rehabilitation (ii) to preserve the data of discharges and specific capacities of tubewells in the form of report which may be utilized as and when desired. (LB)