Seepage Loss Measurement on Chashma Right Bank Canal 'Source Title' Proceedings Workshop on Canal Lining and Seepage 18-21 October, 1993 Lahore - Pakistan
Bibliographic details
Summary
Chashma Right Bank Canal had severe seepage in its Stage 1, particularly in the unlined reach. A number of remedial measures were taken, and the problem is under control now. The canal was regularly monitored by the Alluvial Channels Observation Project for seepage loss. Analysis of the data collected during 1990-92 shows that the 95% confidence interval for average seepage loss rate in the project area for earthen reaches of the canal is 4.381+0.344 cfs/msf, and that for the lined reaches is 2.971+0.306 cfs/msf of wetted area. For the sake of comparison, it may be recalled that the loss rates adopted in the design were 8 cfs/msf and 2 cfs/msf for unlined and lined parts of the canal respectively. Using the seepage rates found in this investigation, the expected total seepage loss from the project may be revised downward, from 385 to 327 cfs. The seepage loss rate determinations have been examined critically for errors, and it has been concluded that they fulfil desired standards of accuracy. The observations show that the difference between average seepage from brick lined and plane-cement-concrete lined parts of the canal is practically insignificant. The measurements also show that there is little correlation between seepage loss rate and inflowing discharge in the canal.