PakCat catalogue record

Comments on Meco's "Draft Feasibility Report-Basha Storage and Power Project" of March 1984

Bibliographic details

Summary

The project location including accessability environment and the proposed general arrangement at the Basha site are reasonable and adequate for the purpose of feasibility. Key development dates (Table-4 Summary Description of Project) envisage start of exploration, studies and model testing from July 1984. This would ultimably lead to start of commercial project operation by July 1995. Aside from being very tight, the schedule looks optimistic specially view of pre-occupation with Kalabagh and stringent financial situation of the country. Whereas the scheme looks technically resonable and sound, some additional information (geotechnical as per comments later) could have improved the reliability of the study. The least cost -Basha power development is concluded to be Dassu Project. Being a major undertaking (costing even more thant Basha) this should be subject to review of MECO's overall Hydel inventory and Ranking Studies now under finalisation.(LB)