Supplementary Inforamtion Regarding Comments of DRC on Meco's Report of October 1984 Basha Storage and Power Project-Feasibility Study
Bibliographic details
Summary
Initial comments of DRC were communicated to MECO vide DRC Publications No.1 transmitted on June 20, 1984. These comments were responded to by MECO vide their letter of July 17, 1984. Whereas some of the observations of DRC were accounted for in the final report, the others were not. The final feasibility report of MECO was reviewed by DRC in early 1986. When a working paper on Basha Dam was prepared for consideration of the Cabinet Committee on Major Dams. A copy of the last review was funrished to Member (Water) for his preusal, which also included indentification of the fact that complex tectionics of the area warranted detailed study and its effect on the seismicity. The supplementary information was produced to Member (Water) on following aspects. a) Effects of the pocket o silty clay and gravels encountered in borehole BS 15A at a depth of 191.6m on the bedrock profile. b) Identifying the extent of sand layers detected in river-bed borehole BS-9 liquefication Potential c) Geotectonics of the Region covering Basha area. d) Likelihood of occurance of earthquakes at a depth of 5 km below the dam including its implications on MCE/OBE.(LB)