Hydrological Network in Baluchistan
Bibliographic details
Summary
The Provincial Irrigation Department made a specific request to the Irrigation Research Council for preparing a study on planning an adequate network of hydrological station along with necessary classification in regard to the equipment, manpower and financial resources required. The Irrigation Department also desired that a project should be prepared for submitting it to the local and foreign agencies. Following this an expert group was invited to help preparing a report on the subject and give a review of existing facilities, conceptual analysis of Hydrological Network and desirability of each station's location. Further work consisting of the type of stations, equipment for these stations and the staff requirements is expected to be done in the second phase of the study. In view of the constraint on financial resources the terms of reference given to this group were limited to; (i) identify hydrological zones of Baluchistan; (ii) consider the adequacy (or otherwise) of the existing network, and bring out any deficiencies; (iii) consider the density of existing stations and proposals for new stations to provide adequate coverage to areas of interest.(LB)