Groundwater and Reclamation Programme Project No.7 Upper Bari Doab Vol.1, 1968 Volume Vol.I
Bibliographic details
Summary
The salinity control and reclamation project 7 of the West Pakistan Water and Power Development Authority (WAPDA) is the seventh in a series of reclamation schemes conceived to arrest the twin menace of waterlogging and salinization of lands of the Indus Plains. The SCARP-7 aims at accomplishing the above objective by the installation of about 1,170 tubewells of 2 to 5 cusecs capacity and the provision of appurtenant facilities. The total estimated capital cost of the project is Rs. 197.5 millions - Rs.134.5 millions for the construction of tubewells and appurtenant facilities and Rs.63.0 millions for electrification. The foreign exchange component is 40 percent of the total cost. It is considered that as a result of the operation of the project, the additional water available will be sufficient to meet the water requirements of crops to achieve an annual cropping intensity of 147 percent and the project will yield a benefit-cost ratio of 6.5:1 giving an internal rate of return of 31 percent. Thus it will provide a great stimulus to agricultural growth in this region.(LB)