Feasibility Stsudies Ready for Involvement of Private Investment under 1998 Power Policy 'Source Title' 68th Mid term Symposium on Need for Hydropower Development to Solve Energy Crisis, Lahore, April 1999. Vol.36

By Iliass, G.M

Bibliographic details

Summary

Inventory studies in the northern mountainous areas of Pakistan including NWFP, Northern Areas as well as on barrages and canal falls in the irrigation systems of low lying areas of the country have revaled hydro-power potential at more than one hundred individaul sites. So far 13 feasibility studies have been prepared in the public sector and are being offered to the private sector for setting up power plants. A number of projects were initiated by the Government of NWFP and Letters of Support (LoS) were issued under the Government of Pakistan Policy Frame-work of 1994-95. However, no concrete results were achieved. Only of these projects stands allocated to private investors but their fate is unknown. The Government of Pakistan has reviewed the whole issue of private Power Policy and finally issued the Revised Policy for New Private Independent Power Projects in July 1998. This policy is much more favourable for hydro-power projects than the previous one. It provides a trariff-structures more adequate for hydro-power and ensures more transparent procedures. The policy stipulates further that the project sites should be offered for IPP's preferably on the basis of feasibility studies prepared in the public sector. There are five projects availabe in NWFP for early issuance of Request for Proposals (RFP) to invite investors under international Competitive Bidding (ICB) for implementation as their feasibility studies are readily available. The locations are: (1) Khan Khwar near Besham, Swat District 72 MW; (2) Golen near Kaghozi, Chitral District 100 MW; (3) Dara Khwar near Bahrain, Swat District 35 MW; (4) Summar Gah upstream of Dassu, Kohistan District 28 MW; 5. Batal Khwar near Utror, Swat District 8 MW. An integrated trasnmission study has been carried out to transport the energy into the National Grid whilst costs are to be borene by the respective projects. Presently prepareations are being undertaken by Government of NWFP in collaboration with the Federal Government Institutions Like PPIB and NEPRA to attract investment for these projects. As the lead time for hydel plants is relatively longer, it is strongly recommended that work on their implementation be started immediately to ensure their commissioning by 2005- 2006. By that time, the surplus thermal power is expected to be fully utilized to meet the demand of the coming years.