PakCat catalogue record

Irrigated Agriculture Demands Reliability, Equity and Adequacy in Irrigation Systems; Work Plan 1986-87

Bibliographic details

Summary

The work plan for the year 1986-87 covers the back-log of the previous two years, as far as financial allocations are concerned. Physical targets under drainage component are not commensorating with the SAR schedules. Efforts have been made to cover maximum irrigation works so that shortfall occured under drainage can be covered during the coming years. This document covers introduction to the project area, approach being followed in the project implementation and project activities in brief. Abstract of physical work plan and financial work plan have also been given for an overview of physical works scheduled for different subprojects and financial implications. The sites for civil works have been mentioned briefly by showing the names of channels and respective reaches. The detail is shown in the maps. Implementation schedules for different activities have been shown with the help of horizontal bar charts. The work plan for IDA component has been further eleborated in a plan prepared by the local supervisory consultants, messrs NESPAK-NDC Joint venture. The same for USAID component has been done by Messrs ACE Joint Venture in the form of a management Plan.