PakCat catalogue record

Salinity Control and Reclamation Project Groundwater Development and Reclamation Programme Revised P.C.I. Form Replacement of 250 damaged/deteriorated Tubewells North Rohri and Kharipur Tubewell Projects, 1984

Bibliographic details

Summary

The objective of this project is to restore pumpage and irrigation supplies toward their authorized limits by replacing all such damaged and deteriorated tubewells which have since outlived their economic lives. The total designed capacity of these wells (250) is 675 cusecs but presently, these are capable of pumping hardly 30 percent of the disired capacity. On fall percent oft he desired capacity. On full substitution of the damaged/deteriorated wells with new wells, an installed deficiency of 675 cusecs will be made up. At say 50 percent utilization these tubewells 50 percent utilization these tubewells would be pumping 0.246 million acre-feet of water annually and alongwith surface water supplies it would help in raising the supplies it would help in raising the existing cropping intensities and yields towards the planned targets.(LB)