Engineering Services for Flood Protection of Pat Feeder and Kirthar Canal Baluchistan Portion Planning & Design Report, 1981 Volume Vol.1
Bibliographic details
Summary
The report has been presented in two volumes; the first volume describes the general strategy, evaluation procedures for analytical studies and approach for the formaualtion of ana effective flod control plant for the area, while second volume contains engineering drawings for the structural measures recommended for execution. The fist Chapter of the report outline stht ebrief history of the problem and its urgency for feasibility studies, while second Chapter gives a short description of the area, physical features, climate, economy and agriculture of Baluchistan in general and project area in particular. Chapter 3 of the repor outlines hrt flood problems in perspective, past flood events, existing flood protection facilities and their evaluation. Hydrologic evaluation and procedure alongwith criteria for selection of return period of rainfall storm and runoff hydrographs are discussed in chapter 4. Management opportunities of floodwater in upper catchments of each major hill torrent affecting Pat Feeder are described in Chapter 5. Pat Feeder and Kirthar Canal in Baluchistan have been divided into problem zones on the basis of dedailed analyses and flood damage potential associated with hill torrents striking these canals. The prolems of each prolem zones have been idendified. Detailed hydrologic analyses have been carried out for the evaluation of various hydrologic components at Darrah sites and then routed to Pat Feeder and Krithar Canals. Various possible solutions to the problem were considered in detail. The most cost effective alternate has been adopted for each problem zones. Overall solution at a glance is presented in a schematic diagram exhibit 1-V-17. chapter 5 contains the detailed description problem wise. Indentification of detention reservoirs in the upper catchment and thier hydrogeologic evaluation are given in Chapter 6. Design of the selected flood disposal schmes age given in Chapter 7, while Chapter 8 details Cost Estimates and recommeded sequence of construction respectively. Economic evaluation of the project is laid out in chapter 9. For convenience sake, pat Feeder and Kirthar Canal were split in reaches identifying the problem zones. Each problem area has been studied in detail from the hydrologic and flood damage stand point. Alternative solutions have been subjected to economic evaluation to arrive at the cost effecgive solution to the problem. Flood routing studies carried out indicated that disposal of floodflows of some major hill torrents in likely to create problems in lower reaches. Efforts were therefore, concentrated for dispersing flood flows in the upper reaches. Entire Baluchistan, particularly Kachhi Basin being water deficient area, solutions to the problems were oriented towards possible utilizing waters for agricultural purposes while shaving off the peaks to mitigate food hazard.