Evaluation Report Of Salinity Control And Reclamation Project-1 (PRE-PROJECT TO 1980-81)

Bibliographic details

Summary

SCARP-1 located in the Central Rechan Doab is the first tubewell project excuted by WAPDA in under to eliminate the salinity and water logging problem and to improve the agricultural productivity of the area by supplementing its existing surface water supplies with ground water through tubewell. The project extends over a gross area of 1.22 million acres in the Districts of Sheiphupura, Gujranwala, Faisalabad and Jhang of of which 1.14 million acres are culturable. Initailly 2043 tubewells having capacities from 2.0 to 5.0 cusecs were installed and put into operation progressively between 1959 through 1964. Some thirty one tubeweels were added thereafter and to total number of tubewells stood at 2074 by the end of the year 1981. In view of the huge capital investment made on this project there was a dire necessity of evaluating ghe effectiveness of this project in terms of designed characteristics and planned objectives under actual operating conditions. Collection of essential data, their analysis and interpretation in the disciplines of hydrology, soils, water quality, agriculture and agricultural economics were therefore, considered essential. Keeping in view these objectives, various units of C.M.O. have been conducting monitoring studies in the area and collecting data since its commencement.