Storage Capacity Sedimentation Of Khokhar Zar Dam Hydrological Survey

By Muhammad Saleem

Bibliographic details

Summary

Echo-sounding of Khokhar Zer Dam was carried out during May, 1985. The water level in this reservoir was at R.L. 1989. Elevation capacity table has been prepared upto this level. The prestorage capacity of Khokhar Zer Dam upto R.L. 1982 (the cill level of the out let canal) and upto RL 1982 (the level at the time of present survey) were 710 and 1240 A. ft respectively the present capacity of these elevations have been estimated to be 440 and 1080 A. ft. respectively. These changes have taken place in about 6 years after the impounding of water in the reservoir. The prestorage bed level was at RLT 1841. In the present survey the bed level has been observed to be at RLI 1868. Total existing capacity upto storage level of RL 1909 (the spilway crrest level) and upto max storage level of RL 1921 can be estimated by conducting ground survey of the area above RL 1889. It has been observed that sediment desposition takes place at different levels. Coarser materials is deposited is near the entrance of the Dam while finer one in the deeper regions of Dam. It has been observed that the sedimentation in the lake is composed of fine clay and no coarser material has been observed.(LB)