An Overview on East Khairpur Tile Drainage Project 'Source Title' Proceedings of the Indo-Pak Workshop on Soil Salinity and Water Management February 10-14, 1990 Volume Vol.2
Bibliographic details
Summary
Only in late sixties tile frainage has been considered as most suitable drainage alternative for shallow saline groundwater areas of Pakistan. Thus construction of East Khairpur Till Drainage (EKTD) Project was conceived in 1977 as a pilot project to generate valuable data to help design and construct efficient tile drainage system in alluvial soils of Pakistan. In this direction Drainage and Reclamation institute of Pakistan (DRIP) conducted premier research on its mini project within the EKTD Project. The entire project was completed in 1986 over an area of 15000 hectares (37200 areas) at capital cost of Rs. 43800 ha-1 (Rs.17500 acrs-1). This project has become so expensive that capital cost cannot be recovered from the farm income. The operation and maintenance costs excluding pump operator cost were requested by operating agency at Rs. 265 per acre- year). On the basis of experiences gained from the entire project, the capital cost of tile rainage has been lowered down by DRIP to Rs. 10000 acre-1 where land owners could share 30% of the capital cost and 100% of the repair and maintenance costs