PakCat catalogue record

Khairpur East Pilot Project Bench Marks and Levelling Drain Alignments Trail Block-Block 1

By Lenselink, K.J

Bibliographic details

Summary

The Report in hand describes the fixed points used, the process of fixing new bench marks and demarcation and leveling of collector and lateral drain alignments. The length profiles plotted and presented in this Report were used to check whether it is practicable to maintain the designed average drain depth and the slope given to the drains. It has been revealed that parts of some of the drain lines will be shallower than designed due to uneven land surface and, at places, top soil may have to be removed to bring the deeper drains within working range of the Trencher-Tile Laying Machine donated by the Netherlands. The experience gained in this process will be extremely useful for design and layout of drain network in other Blocks of the Pilot Area or in other similar projects.(LB)