Some Benech Mark Data of East Khairpur Tile Drainage Pilot Project
Bibliographic details
Summary
This Report describes actual field conitions in the Project area as regards watercourses, outlets, survey numbers and warabandis, cropping patterns and some relevant meteorological data. The Report also takes a look a possible obstructions in the way of the Trencher machine when it starts to install tile lines. It further throws light on the methodology of compilation of a base map of the Pilot Area. The collected data have been critically examined and evaluated. The inforamtion will be used in setting up of experiments on soil and water management aspects of the Pilot Area and pre and post-monitoring studies. Some of the recommendations of this Report have been used in preparing the final design presented in DRIP Report 7 since published.(LB)