Water Supply Augmentation with Fractional Tubewells, 1993
Bibliographic details
Summary
Irrigation water requirement is increasing proportionally with cropping intensity. Due to the large conveyance losses along main canals and misappropriation in the distribution system, tail command of distributaries/ minors and watercourses suffers from shortage of canal water. In the early sixties large number of deep tubewells were installed in Pakistan for supplemental irrigaton and vertical drainage. About 80 percent of these have been closed due to deterioration. Brackish water upconing and intrusion is a big problem for tubewells being installed in the aquifer having limited thickness of fresh water layer underlain by saline water. It was discovered during sub-surface investigation of different projects that in some areas, saline groundwater underlies the usable quality groundwater the thickness of which is rather limited. To overcome the problem of supplemental irrigation and vertical drainage particularly in the tail of distributaries and minors having sufficient layer of fresh water, this was initiated in the Lower Indus area. For the study, the command area of watercourse 13-R Suhi Kandher distributary which suffers from inadequate irrigation supplies, and has a flat topography and an aquifer of good quality water in the tail and marginal in head and middle section was selected. The technology of low discharge fractional well in such a situation is found not only technically feasible but also financially viable on a watercourse command basis. The water quality was maintained by operating the well about 10-12 hours continuously. The cropping intensity was increased by 4.7% in kharif and 4.5% in rabi seasons. The conjunctive use of tubewell with canal water increase the yield of cotton and wheat crops by 14.0% and 14.5%. A benefit cost ratio of 1.75 was obtained.