Development of New Techniques for Watercourse Improvement (Interim Report) 1992
Bibliographic details
Summary
The experiment was undertaken as a pilot research study to develop and test the feasibility, durability and adaptability of different watercourse improvement techniques by using different materials for lining and testing various designs under local socioeconomic conditions. The study was conducted for the period of three years. As per requirements of research work, watercourses, 2-L Dahra Minor and 1-R Dhando Minor were selected for testing the different improvement techniques. Watercourse 2-L Dahra Minor was improved earthenly and 1-R Dhando Minor improved by 4.5 and 9 inches brick masonry lining. The study was started during rabi 1989-90. The initial observations were considered as pre-improvement bench mark data. After the improvement of watercourses required data was collected during the season kharif 1990. On the basis of two seasons observations, status report showing the status of water losses was published in February, 1991. For monitoring the water losses, cropping intensity and feasibility of different improvement techniques data have been collected for next rabi and kharif seasons. The interim report contains the details of water losses, improvement in cropping intensity, feasibility and cost per linear ft. of different watercourse improvement techniques. Study needs to test the PVC, concrete, polyethylene and mud plaster linings also, but due to funds constraint only three techniques were tested during the research period. However the study is still in progress, if the funds problem resolved the above mentioned techniques will be tested under the local socioeconomic conditions and results/achievements will be discussed in final report.