"Multilateral Pipe Drainage for Seepage Interception" 'Source Title' Proceedings of 5th International Drainage Workshop, February 8-15, 1992, Lahore Volume II
Bibliographic details
Summary
Seepage from unlined irrigation channels has remained one of the major causes for waterlogging and consequent salinity. Alternative to the canal lining is to install intereceptor drains along these channels. Drainage and Reclamation Institute of Pakistan (DRIP) is, therefore conducting research through physical and computer models to evolve end-user originated designs of subsurface interceptors to motivate the farmers to share the drainage costs. A three-dimensional finite element model for simulation of flow from canal to interceptor drains is developed which is first of all, calibrated against physical model and then is used to determine most suitable location of drains with reference to the recharging source. Physical model as two rows of interceptors, installed 73 and 123 meters respectively away from the water line of canal at a depth of 3.45 m below the water level in the canal, and 1.75 m below the ground surface. After its proper calibration, computer model is run to predict the groundwater profile and seepage interception via single and multiple row laterals. Computer runs are made for drain depths between. 1.75 and 3.0 meters below ground surface, however, lateral spacings are kept as adjustable experimental variables under lateral and vertical influx conditions. Studies on physical as well as computer model suggest that smaller-diameter multiple lateral system can offer a better and economical watertable control alternative over larger-diameter single line interceptor system placed very close to the canal.