PakCat catalogue record

An Overview on East Khairpur Tile Drainage Project 'Source Title' Journal of Drainage and Reclamation Volume Vol.2, No.1

By Chandio, Bashir A

Bibliographic details

Summary

Only in late Sixties tile drainage has been considered as most suitable drainage alternative for shallow saline groundwater areas of Pakistan. Thus construction of East Khairpur Tile Drinage (EKTD) project was conceived in 1977 as a pilot project to generate valuable data to help design and construct efficient tile drainage system in alluvial soils of Pakistan. In this direction Drainae and Reclamation Institute of Pakistan (DRIP) conducted premier research in its mini project within the EKTD project. The entire project was compeletd in 1986 over an area of 150000 hectares (37200 acres) at capital cost of Rs.43800/ha (Rs.17500/acre). This project has become so expensive that capital cost cannot be recovered from the farm incomes. The operation and maintenance cost excluding pump operator cost were requested by operating agency at Rs.265/-ha-year (Rs 106/acre-year) but the drainage charges were levied at a rate of Rs.80/ha-year (Rs 32/acre-year). On the basis of experiences gained from the entire project, the capital cost of tile drainage has been lowered down by DRIP to Rs.10000/acre where land owners could share 30% of the capital cost and 100% of the repair and maintenance costs.