"Difficulties in the Construction of Pipe Drainage Projects in Pakistan & their Influence on the Design of the Khushab SCARP Pipe Drainage Project" 'Source Title' Proceedings of 5th International Drainage Workshop, February 8-15, 1992, Lahore Volume III
Bibliographic details
Summary
The design of Khushab Scarp started in 1990 and construction is to start in 1992. An analysis of construction problems as faced by other horizontal pipe drainage projects in Pakistan has been made. Installation of collector drains deeper than 3.5 meters in unstable soils was a major problem. The analysis was then used to modify the design of the Khushab SCARP pipe drainage project, partly by choosing the minimum drain depth possible. Other parameters discussed are gravel filter design and installation and sump design. The prequalification activities as experienced by the project are then discussed. The paper closes with a list of constructions in pipe drainage projects.