Participating library

PCRWR Library

Catalogue records discovered through PCRWR Library in Islamabad, Federal.

Visit library website 16944 catalogue records

Catalogue records

Review of Preliminary Flood Hydrology Bertle, F.A. 1983 Review of Kalabagh Consultants Proposal for Hydraulic Modelling Mosonyi, E.F. 1983 World Bank Government of Pakistan and WAPDA Experts Reports WBR-1 to WBR-15 Volume Vol.1 Author not listed 1988 Technical Memorandum-51; Mathematical Model of Kalabagh Sedimentation-Sensitivity Studies; Vol. IV of Supplemental Documentation, SPD-4 Author not listed 1988 Technical Memorandum-50; Kalabagh Reservoir Filling Study; Vol. IV of Supplemental Documentation, SPD-4 Author not listed 1988 Technical Memorandum-49; Impact of Kalabagh Dam on Sailaba Cultivation in Sind and Sea Water Intrusion in the Indus Estuary; Vol. IV of Supplemental Documentation, SPD-4 Author not listed 1988 Technical Memorandum-48; Selection of the Modified Project; Vol. II of Supplemental Documentation, SPD-2 Author not listed 1987 Technical Memorandum-47; Mathematical Model Study of Kalabagh Reservoir Sedimentation; Vol. I of Supplemental Documentation, SPD-1 Author not listed 1987 Technical Memorandum-46; Economic Evaluation of Modified Project; Vol. II of Supplemental Documentation, SPD-2 Author not listed 1987 Technical Memorandum-45; Probable Maximum Flood and Routing Studies for Modified Project; Vol. I of Supplemental Documentation, SPD-1 Author not listed 1987 Technical Memorandum-44; Future Use of Low Level Outlets (Updated); Vol. II of Supplemental Documentation, SPD-2 Author not listed 1987 Technical Memorandum-43; Irrigation Release Capacity (Updated); Vol. II of Supplemental Damcumentation, SPD-2 Author not listed 1987 Technical Memorandum-42; Turbine Relief Valves; Vol. II of Supplement to Project Planning Report,PPS-2(Appendix-HHS) Author not listed 1985 Technical Memorandum-41; Investigation of El. 932 Top Water Level; Vo,. III of Supplement to Project Planning Report, PPS-3 (Appendix-ZAS) Author not listed 1985 Technical Memorandum-40; Layout of the Left Bank Works; Vol. II of Supplement to Project Planning Report, PPS-2 (Appendix-MS) Author not listed 1985 Technical Memorandum-39; Supplementary Studies on the Economics of Additional Installed Capacity of Kalabagh; Vol. III of Supplement to Project Planning Report,PPS-3 (Appendix-ZAS) Author not listed 1985 Technical Memorandum-38; Handling of Kharjwan Nala; Vol. II of Supplement to Project Planning Report,PPS-2(Appendix-MS) Author not listed 1985 Technical Memorandum-37; Power-Oriented Conjunctive Operation of Tarbela and Kalabagh Reservoirs; Vol. III of Supplement of Project Planning Report,PPS-3(Appendix-XS) Author not listed 1985 Technical Memorandum-36; Dam Section Over the Power and Low Level Conduits; Vol. II of Supplement to Project Planning Report,PPS-2(Appendix-MS) Author not listed 1985 Technical Memorandum-35; Low Level Outlet Works-Flip Bucket Plunge Pool Alternative; Vol. II of Supplement of Project Planning Report,PPS-2(Appendix-MS) Author not listed 1984