Review of Preliminary Flood Hydrology
Bertle, F.A.
1983
Review of Kalabagh Consultants Proposal for Hydraulic Modelling
Mosonyi, E.F.
1983
World Bank Government of Pakistan and WAPDA Experts Reports WBR-1 to WBR-15 Volume Vol.1
Author not listed
1988
Technical Memorandum-51; Mathematical Model of Kalabagh Sedimentation-Sensitivity Studies; Vol. IV of Supplemental Documentation, SPD-4
Author not listed
1988
Technical Memorandum-50; Kalabagh Reservoir Filling Study; Vol. IV of Supplemental Documentation, SPD-4
Author not listed
1988
Technical Memorandum-49; Impact of Kalabagh Dam on Sailaba Cultivation in Sind and Sea Water Intrusion in the Indus Estuary; Vol. IV of Supplemental Documentation, SPD-4
Author not listed
1988
Technical Memorandum-48; Selection of the Modified Project; Vol. II of Supplemental Documentation, SPD-2
Author not listed
1987
Technical Memorandum-47; Mathematical Model Study of Kalabagh Reservoir Sedimentation; Vol. I of Supplemental Documentation, SPD-1
Author not listed
1987
Technical Memorandum-46; Economic Evaluation of Modified Project; Vol. II of Supplemental Documentation, SPD-2
Author not listed
1987
Technical Memorandum-45; Probable Maximum Flood and Routing Studies for Modified Project; Vol. I of Supplemental Documentation, SPD-1
Author not listed
1987
Technical Memorandum-44; Future Use of Low Level Outlets (Updated); Vol. II of Supplemental Documentation, SPD-2
Author not listed
1987
Technical Memorandum-43; Irrigation Release Capacity (Updated); Vol. II of Supplemental Damcumentation, SPD-2
Author not listed
1987
Technical Memorandum-42; Turbine Relief Valves; Vol. II of Supplement to Project Planning Report,PPS-2(Appendix-HHS)
Author not listed
1985
Technical Memorandum-41; Investigation of El. 932 Top Water Level; Vo,. III of Supplement to Project Planning Report, PPS-3 (Appendix-ZAS)
Author not listed
1985
Technical Memorandum-40; Layout of the Left Bank Works; Vol. II of Supplement to Project Planning Report, PPS-2 (Appendix-MS)
Author not listed
1985
Technical Memorandum-39; Supplementary Studies on the Economics of Additional Installed Capacity of Kalabagh; Vol. III of Supplement to Project Planning Report,PPS-3 (Appendix-ZAS)
Author not listed
1985
Technical Memorandum-38; Handling of Kharjwan Nala; Vol. II of Supplement to Project Planning Report,PPS-2(Appendix-MS)
Author not listed
1985
Technical Memorandum-37; Power-Oriented Conjunctive Operation of Tarbela and Kalabagh Reservoirs; Vol. III of Supplement of Project Planning Report,PPS-3(Appendix-XS)
Author not listed
1985
Technical Memorandum-36; Dam Section Over the Power and Low Level Conduits; Vol. II of Supplement to Project Planning Report,PPS-2(Appendix-MS)
Author not listed
1985
Technical Memorandum-35; Low Level Outlet Works-Flip Bucket Plunge Pool Alternative; Vol. II of Supplement of Project Planning Report,PPS-2(Appendix-MS)
Author not listed
1984